Посты
СортировкаСначала новые
Случайный пост
Aaron Burnett
@aaronburnett · 22 мар. 2026 г.
Same thing that led from the pic on the left to the pic on the right… only faster.


Elon Musk
@elonmusk · 22 мар. 2026 г.
Yes
57
45
685
23,5 тыс.

Jesse Peltan
@JessePeltan · 22 мар. 2026 г.
I just want to go see it in person.
Elon Musk@elonmusk· 22 мар. 2026 г.Mass drivers on the Moon!
Elon Musk
@elonmusk · 22 мар. 2026 г.
Same
142
63
1,5 тыс.
55,9 тыс.
Elon Musk
@elonmusk · 22 мар. 2026 г.
Mass drivers on the Moon!
6,4 тыс.
11,5 тыс.
123 тыс.
75,6 млн

Scott Manley
@DJSnM · 22 мар. 2026 г.
Whenever space data centers become cost effective, they'll get there first for the company that is vertically integrated with the software, the computer hardware and the launch capabilities.
Terafab is news, but it's not a surprise to anyone that's been paying attention.
Tesla@Tesla· 22 мар. 2026 г.TERAFAB: the next step to becoming a galactic civilization
Together with @SpaceX & @xAI, we're building the largest chip manufacturing facility ever (1TW/year) – combining logic, memory & advanced packaging under one roof.
To harness as much power as possible from the Sun, we
Elon Musk
@elonmusk · 22 мар. 2026 г.
I mentioned it at the Tesla annual shareholder conference
139
115
2,5 тыс.
83,9 тыс.
Elon Musk
@elonmusk · 22 мар. 2026 г.
Space
DogeDesigner@cb_doge· 22 мар. 2026 г.ELON MUSK: "Space solar actually costs less than terrestrial solar because you don't need heavy glass or framing to protect it from extreme weather events. So as soon as the cost to orbit drops to a low number, it immediately makes extremely compelling sense to put AI in space.
3,8 тыс.
8 тыс.
54,3 тыс.
18,6 млн
Elon Musk
@elonmusk · 22 мар. 2026 г.
Rapid recursive improvement
DogeDesigner@cb_doge· 22 мар. 2026 г.ELON MUSK: "We're starting off with an advanced technology fab here in Austin, and I'd like to thank @GregAbbott_TX and the state of Texas for the support.
So in the advanced technology fab, we will have all of the equipment necessary to make a chip of any kind logical memory,
2,1 тыс.
7,1 тыс.
52,9 тыс.
16,4 млн
Elon Musk
@elonmusk · 22 мар. 2026 г.
The most exciting of times ahead!
Tesla@Tesla· 22 мар. 2026 г.TERAFAB: the next step to becoming a galactic civilization
Together with @SpaceX & @xAI, we're building the largest chip manufacturing facility ever (1TW/year) – combining logic, memory & advanced packaging under one roof.
To harness as much power as possible from the Sun, we
2,2 тыс.
4,1 тыс.
49,3 тыс.
35,4 млн
Elon Musk
@elonmusk · 22 мар. 2026 г.
Terafab was the final missing piece of the puzzle
Steve Jurvetson@FutureJurvetson· 22 мар. 2026 г.First view of the 100kw AI Mini Sat with solar panels and heat radiator to scale. “And that’s just the Mini version. We expect future versions to go to the megawatt range.” — Elon
The key missing ingredient is a terawatt of AI compute. Fully integrated fab with recursive




2,1 тыс.
5,7 тыс.
48,9 тыс.
20,7 млн

Jesse Peltan
@JessePeltan · 22 мар. 2026 г.
Confirmed that the plural of Optimus is Optimi
Tesla@Tesla· 22 мар. 2026 г.Announcing TERAFAB: the next step towards becoming a galactic civilization
Elon Musk
@elonmusk · 22 мар. 2026 г.
It’s the best plural
256
100
2,7 тыс.
73,7 тыс.
Elon Musk
@elonmusk · 22 мар. 2026 г.
Exactly
Jesse Peltan@JessePeltan· 22 мар. 2026 г.A terawatt *per year* is HUGE on the scale of current civilization (2x the U.S. grid every year), and yet that’s still 100,000 years to reach Type I, and 10^14 years to reach Type II.
This is still only the beginning.
1,1 тыс.
2,1 тыс.
29,4 тыс.
35,4 млн
Elon Musk
@elonmusk · 22 мар. 2026 г.
Quantity has a quality all its own
TERAFAB
4,7 тыс.
6,3 тыс.
108,6 тыс.
70,3 млн
Elon Musk
@elonmusk · 22 мар. 2026 г.
SpaceXAI + Tesla TERAFAB Project
Goal is a trillion watts of compute/year
Most must necessarily go to space, as US electricity is only 0.5TW
SpaceX@SpaceX· 22 мар. 2026 г.Announcing TERAFAB: the next step towards becoming a galactic civilization
6,1 тыс.
7,6 тыс.
39,7 тыс.
16,9 млн

Ethan He
@EthanHe_42 · 22 мар. 2026 г.
For reference, the entire US runs on only ~0.5 TERAWATT of electricity.
Elon Musk@elonmusk· 21 мар. 2026 г.Formal announcement of the TERAFAB project, which will be done jointly by @SpaceX and @Tesla, tonight around 8pm CT. Livestream on 𝕏.
The goal is to produce over a TERAWATT of compute per year (logic, memory & packaging) with ~80% for space and ~20% for the ground.
Elon Musk
@elonmusk · 22 мар. 2026 г.
Yup
103
63
1,1 тыс.
72,3 тыс.

Warren Redlich - Chasing Dreams 🇺🇸
@WR4NYGov · 22 мар. 2026 г.
If the average chip is 1 kW, this would be 1 billion chips a year.
Assuming this is about five years away, at that point Tesla will hopefully be making 100 units of Optimus a year and 20 million cybercabs a year, for a total of 140 million chips.
That means over 800 million
Elon Musk@elonmusk· 21 мар. 2026 г.Formal announcement of the TERAFAB project, which will be done jointly by @SpaceX and @Tesla, tonight around 8pm CT. Livestream on 𝕏.
The goal is to produce over a TERAWATT of compute per year (logic, memory & packaging) with ~80% for space and ~20% for the ground.
Elon Musk
@elonmusk · 22 мар. 2026 г.
That’s probably about right
57
86
1,6 тыс.
130,5 тыс.
Elon Musk
@elonmusk · 22 мар. 2026 г.
Any self-respecting civilization needs to reach at least Kardashev II
Ashok Elluswamy@aelluswamy· 22 мар. 2026 г.Extreme AI software - AI hardware - Semiconductor fabrication co-design!
2,2 тыс.
3,1 тыс.
47,1 тыс.
52,8 млн
Elon Musk
@elonmusk · 22 мар. 2026 г.
SpaceX
SpaceX@SpaceX· 22 мар. 2026 г.Announcing TERAFAB: the next step towards becoming a galactic civilization
1,7 тыс.
3,5 тыс.
32,3 тыс.
21,3 млн

Pubity
@pubity · 21 мар. 2026 г.
The largest data center in the world is planned to be built in Ohio, and it'll cost up to $40,000,000,000 to construct.
The 3,700 acre center will require 10 Gigawatts, 1/3 of Ohio's entire power grid capacity, to run.


Elon Musk
@elonmusk · 22 мар. 2026 г.
The xAI Colossus data center will cost more and deliver far more computing than that this year
348
373
6,2 тыс.
360,4 тыс.
Elon Musk
@elonmusk · 21 мар. 2026 г.
Formal announcement of the TERAFAB project, which will be done jointly by @SpaceX and @Tesla, tonight around 8pm CT. Livestream on 𝕏.
The goal is to produce over a TERAWATT of compute per year (logic, memory & packaging) with ~80% for space and ~20% for the ground.
3,3 тыс.
6,7 тыс.
51,4 тыс.
32,7 млн

Bloomberg
@business · 21 мар. 2026 г.
OpenAI's Sam Altman won dismissal of a lawsuit by his sister claiming that he sexually abused her for almost a decade bloomberg.com/news/articles/…
Elon Musk
@elonmusk · 21 мар. 2026 г.
Something is deeply wrong with our justice system
1,1 тыс.
1,1 тыс.
15,3 тыс.
386,2 тыс.
Elon Musk
@elonmusk · 21 мар. 2026 г.
Big difference
Arthur MacWaters@ArthurMacwaters· 21 мар. 2026 г.Most people will probably miss that this chart is log scale
Meaning it shows a 10,000X reduction in cost
This is quite literally insane. Engineering is magic.

2,1 тыс.
5,8 тыс.
61,5 тыс.
24,8 млн